Units in the crew compound
A group of units inside the fenced crew area, placed so the walk does not cross the public route and the crew can reach them from the work zone.
Units for crews on school and hospital work, placed clear of deliveries and fire access and serviced around occupied buildings.
Fastest: call (888) 351-0294. Or send this and we call you back.
School and hospital building projects need portable toilets on site for months, and the placement has to clear deliveries, fire access and the entrances that stay open while the building is in use. The plan is drawn with the site owner, because a school or hospital site is often occupied while the work goes on.
A school or hospital project is a building job inside a working place. Students, patients, visitors and staff keep using the entrances, the drives and the paths around the site, and the crew needs its restrooms within reach without any of them being put in the way.
Projects of this kind run for months, and the restroom plan runs with them. We set the units and their route against the site owner's plan, not only against the crew, and we do not state a regional project total, because none was sourced for this page.
Keep units out of the fire lane, the entrances and the walk used by students, patients and visitors. Report a unit that is leaning, blocking a route or near a pedestrian path to the site superintendent at once.
The site owner or the general contractor shares the site plan, the fire access, the entrances that stay open and the hours of use. The restroom plan is drawn onto that plan before anything is delivered.
Units are placed off the fire lane, the delivery bay and the entrances, and the walk from the work area is kept off the pedestrian routes used by the building's occupants.
The count follows the crew size and the phase of the work, and the plan notes any period where the building's own facilities are closed for the job.
Where the site is occupied, the route to the units is signed and servicing is planned for the hours when the grounds are quiet. Visits are never made through a crowd of students or patients.
Units move or come out at the end of each phase, and the spot is checked and returned to the owner in the state the plan records.
Units stay clear of fire lanes, delivery bays and the entrances that stay in use, because a unit in one of those places can stop an ambulance or a delivery during the works.
A fire lane must stay open at all times, and a unit on it is a hazard the fire service will not forgive. The technician checks the fire access on the owner's plan and places each unit at least clear of it, with the distance agreed with the owner.
Entrances used by students, patients or visitors are kept clear. A unit set in a doorway's line of sight is a trip hazard and an obstacle, and the walk from the crew area is routed away from the pedestrian path.
The crew and the units have to work around people who keep using the building, which means a signed route, quiet hours for servicing and no truck through a crowd.
A school day or a hospital shift changes the crowd every few hours. A signed route from the crew area to the units tells the crew where to walk and tells the building's users to stay away from the work zone.
Servicing is set for the quiet hours the owner allows. A truck that arrives during a school's dismissal or a shift change is a risk and a delay, and the schedule is written around those times.
A project that runs through a full year needs a count that changes with the crew and the phase, and the plan states the change points so the owner can see them.
Crews on a school or hospital job grow for the structural phase and shrink for finishing. The count follows that pattern, and the change points are written on the plan so the owner knows when a unit is added or removed.
The building's own facilities may be closed for part of the work. Where that happens, the plan notes the closure, and the count is increased to cover the crew for the period.
Units leave the site in the state the owner's plan records, and the spot is returned clean, with no marks on the grounds that the owner has to repair.
When a phase ends, the units are emptied and removed or moved. The spot is checked for spills, ruts and marks from the pad, and the owner's representative signs the record of the state the spot was left in.
A final handover of the site includes confirming that all units have gone, the fire access is clear and the entrances are open.
Units are kept away from the noisiest and dustiest parts of the works, and the servicing visits are timed around the hours the owner sets for quiet, so the building's users are not disturbed.
A school or a hospital is sensitive to noise and dust. The servicing truck runs its engine and its pump, and the owner may limit when that can happen. The visit is timed to the hours the owner allows and kept to the route the owner has approved.
Units placed near the dustiest part of the works are cleaned more often, because dust settles on the walls, the seat and the hand sanitiser in a short time.
The general contractor and the site owner agree one set of rules for the units, so a crew from one trade does not move a unit that another trade depends on.
A building site is shared by several trades, and each one wants a unit close to its own work. Without a rule, the units move to suit whoever shouts loudest and the owner's route is lost. The plan names the one party that can move a unit and the process for asking.
The owner's own facilities are also agreed. Where a building restroom reopens for part of the job, the plan records the date so the units are reduced at the right time and not left in place out of habit.
A group of units inside the fenced crew area, placed so the walk does not cross the public route and the crew can reach them from the work zone.
Units outside the fence on a firm pad, used where the crew area is small and the site owner allows a unit at a set point on the perimeter.
A restroom trailer placed in the crew compound for a long project with a larger crew, serviced on a schedule that follows the site's quiet hours.
School and hospital sites in Baltimore and the county towns around it sit on older campuses where drives and service lanes are narrow and the fire access is fixed by the building's own layout.
A project on a public school site follows the same placement logic as any site with occupants, and the site owner's own plan sets the route and the hours.
No Baltimore figure for school or hospital building work was sourced, so this page sets no regional count and plans each campus from its own plan.
Tell us when you need someone and we book the earliest visit a school and hospital project restrooms technician has, and you approve the price before any work starts.
Not sure if you're covered? Check your ZIP code.
Unit counts by crew size and phase, placed clear of work zones and serviced on a schedule the job can keep.
Units that follow the work front along a corridor or across a bridge, moved on planned days and serviced around the closures.
Handwashing stations with running water and drainage, placed beside the restrooms for events, food vendors and job crews.
Scheduled pumping, restocking and the hauling of waste, with the hauler's duty stated and the paperwork named.
A written restroom plan for each event: counts, layout, servicing and the drawing a city or county office can review.
Baltimore is an independent city, not part of Baltimore County, so a job site inside the city and one in a county town come under different offices.
Not in the line of the entrance or in a fire lane. The owner's plan sets the distance, and the technician places the unit to that plan.
During the quiet hours the owner allows, on a signed route that keeps the truck away from students, patients and visitors.
The units are the same, but the placement and the route are planned with the site owner and the fire access in mind, and servicing is timed to the hours the owner sets.
The count follows the crew size and the phase of the work. No regional count was sourced, so the number is set for each campus from its own plan.
The units are removed or moved, the spot is checked against the owner's record and the owner's representative signs the handover.